Skip to content
Profound Estimates
Takeoff and project cost For subcontractors

Trade Takeoff Worksheets

Measure each area once and get order quantities for concrete, drywall, roofing, paint and flooring, with waste factors you control. Download a clean Excel takeoff with live formulas, one sheet per trade.

  • Free, no sign-up to calculate
  • Download as Excel or PDF
  • Reviewed September 28, 2026

Project

Concrete
65.5 CY
62.25 CY net
Drywall
251 sheets
9,062 SF of board
Roofing
48 sq
43.6 squares net
Paint
86 gal
8,764 SF of surface
Flooring
3,067 SF
2,872 SF net
Trade

Concrete areas

Measure each area once. Totals and order quantities update as you type.

AreaTypeCountLength ftWidth ftDepth inReinforcingBarSpacing in / barsCYRebar LFForm LF
39.510240
17.78480484
214472
2.9634652

Order quantities

Rounded up to what suppliers sell, with your waste factors.

ItemQuantityUnit
Ready-mix concrete (incl. 5% waste)65.5CY
Rebar, 20 ft bars (incl. 10% laps)54bars
Rebar weight712.76lb
Welded wire mesh, 160 SF sheets22sheets
Edge and footing forms848LF
Form contact area662SFCA

Concrete by area

  • Slab on grade
    39.51 CY
  • Perimeter footing
    17.78 CY
  • Entry apron
    2.96 CY
  • Column pads, 3 x 3 (4 bars each way)
    2 CY

Waste, laps and coverage

Defaults are common rules of thumb. Match them to your products, specs and crew.

%
%
ft
%
SF

8 x 20 sheet = 160 SF

Download your results

An Excel takeoff with a sheet per trade and live formulas, or a PDF summary of every trade.

Your inputs stay in your browser. Results are estimates for planning, not professional, tax or legal advice.

What the worksheets do

A takeoff has two halves. First you measure: lengths, widths, heights and counts from the drawings. Then you convert those measurements into things a supplier sells: yards of concrete, sheets of board, bundles of shingles, gallons of paint, cartons of flooring. The second half is where mistakes hide, in a forgotten waste factor, a roof measured flat, or rounding down instead of up.

These worksheets handle the conversion. You enter each area once, set the waste and coverage factors for your products, and get order quantities rounded up to whole units. The Excel download rebuilds every number as a formula, so it works like a takeoff sheet an estimator would build by hand.

Concrete

Each area is a slab or a footing with a count, length, width and depth in inches.

  • Volume: count × length × width × (depth ÷ 12) ÷ 27 = cubic yards. Ready-mix is ordered in quarter yards after waste.
  • Rebar in slabs: a grid at the spacing you enter, each way. Bars running the length are spaced across the width and vice versa, with one extra bar in each direction.
  • Rebar in footings: the number of continuous bars × length. For square pads, enter the bars in both directions.
  • Laps and splices add a percentage to rebar length. Weight uses standard pounds per foot (#4 = 0.668 lb/ft).
  • Mesh: slab area plus laps, divided by the sheet size (an 8 × 20 sheet is 160 SF).
  • Forms: perimeter of each area, and contact area (SFCA) = form length × depth.

Drywall

Walls are entered as wall length × height × sides, ceilings as room length × width. Deduct openings once, and choose layers and sheet length for each area. From the board area the worksheet works out sheets by size, joint compound (about 10 gallons per 1,000 SF for a level 4 finish with ready-mix), paper tape (about 370 LF per 1,000 SF), screws (about one per SF) and corner bead from the outside corners you enter.

Roofing

Enter the plan dimensions including overhangs, the pitch, and the ridge and hip, eave and rake lengths. Roof area = plan area × slope factor. Shingles are ordered in bundles, usually three per square. Accessories come from the edge lengths: starter along the eaves (and rakes if you install it there), drip edge on eaves and rakes, ridge cap on ridges and hips, and ice and water shield a set distance up from the eaves.

Paint

Each area is length × height (or length × width for ceilings) less deductions, with its own number of primer and finish coats. Gallons = area × coats ÷ coverage, plus waste, rounded up by product. Finish paint is totaled separately for walls, ceilings and other surfaces because they usually take different products and sheens.

Flooring

Each room has its own material and waste factor, since a diagonal tile layout wastes far more than plank in a square room. The worksheet totals order SF by material, cartons when you enter the carton size, underlayment rolls and transition strips.

A worked example

A flooring and interiors contractor is pricing a single-story dental office of about 3,200 SF, with an 80 × 40 ft slab on grade. Measured areas, with the default factors, produce:

Trade Key quantities
Concrete 62.25 CY net, 65.5 CY ordered; 970 LF of rebar, 54 bars of 20 ft with laps (713 lb); 22 sheets of mesh; 848 LF of forms
Drywall 9,062 SF of board: 245 sheets of 4 × 10 and 6 of 4 × 12; 21 buckets of mud, 7 rolls of tape, 10 boxes of screws, 20 sticks of corner bead
Roofing 4,360 SF of roof (43.6 squares) from a 6/12 gable and a 4/12 canopy: 144 bundles (48 squares), 5 rolls of underlayment, 4 rolls of ice and water, 5 bundles of ridge cap, 4 of starter, 35 pieces of drip edge
Paint 8,764 SF of surface: 30 gal primer, 50 gal wall finish, 1 gal ceiling, 5 gal doors and frames
Flooring 2,166 SF of LVT (93 cartons), 739 SF of carpet tile (16 cartons), 161 SF of porcelain tile (11 cartons), 2 rolls of underlayment, 10 transitions

A few details worth noticing. The roof is 11.4% bigger than its footprint because of the 6/12 pitch; measuring it flat would have come up about 5 squares short. The interior partitions are boarded on both sides, so 310 LF of wall is 5,780 SF of board after 420 SF of openings. And the restroom tile carries 12% waste while the LVT carries 7%, because small rooms with tile cut more.

Round up at the end, not along the way. The worksheet keeps full precision per area and rounds each order quantity once, so you don’t buy an extra bundle for every room.

Tips for a clean takeoff

  • Name areas the way the plans do (room numbers, grid lines, wall types). It makes the takeoff checkable.
  • Keep deductions honest. Deduct large openings. Most estimators ignore openings under about 20 SF on drywall and paint because the cutting waste eats the savings.
  • Check factors against the product. Coverage, carton sizes and bundles per square vary by manufacturer. The defaults are rules of thumb.
  • Save the Excel file with the bid. When an addendum changes a room, edit that row and every total follows.

Turn quantities into a price with your crew’s true hourly cost from the labor burden calculator, then send it with clear inclusions and exclusions using the bid proposal builder. If the job needs a machine for the concrete or roofing, the equipment own vs rent calculator shows whether to buy or rent it.

Trade estimating guides

How estimators take off and price each trade, with the same production rates and waste factors this tool uses.

All trade guides →

Frequently asked questions

What waste factor should I use?

Common starting points are 5% for ready-mix concrete, 10% for drywall board, 10% for shingles on a simple gable roof (15% or more on hips and cut-up roofs), 5% to 10% for paint, 5% to 7% for plank flooring or carpet tile in square rooms and 10% to 15% for tile or diagonal layouts. Adjust them to your crews' actual results.

How do I convert a roof's plan area to squares?

Multiply the plan (footprint) area by the slope factor for the pitch, then divide by 100. The slope factor is the square root of 1 + (rise ÷ 12)². A 6/12 roof has a factor of 1.118, so 3,696 SF of plan area is about 4,132 SF of roof, or 41.3 squares before waste.

How many sheets of drywall do I need?

Take the boarded area (wall length × height × sides, less openings, times layers), add waste, and divide by the sheet size: 32 SF for a 4 × 8, 40 SF for a 4 × 10, 48 SF for a 4 × 12. The worksheet does this per area so each wall can use the sheet length that fits it.

Can I edit the Excel file?

Yes. Every total and order quantity is a formula. Change a dimension, a waste factor or a coverage rate on any trade sheet and the totals, order quantities and the summary sheet update. Nothing is locked.

Does this replace a digital takeoff program?

It replaces the spreadsheet you'd build yourself after measuring. You still measure lengths and areas from the plans, with a scale, a PDF markup tool or takeoff software. The worksheet turns those measurements into quantities you can order and price.

Need quantities measured?

We measure your plan set and deliver an editable Excel takeoff you can price and adjust.

Learn about the service