Proposal-ready inclusions, exclusions and clarifications for 12 trades. Pick the lines that fit your bid, reword them, and export a clean numbered list.

  • Free, no sign-up to calculate
  • Download as PDF
  • Reviewed September 27, 2026

Trade

Switching trades loads that trade's starter list. Reword anything to match your plans, specs and prime contract.

Inclusions

5 selected
  1. 1.
  2. 2.
  3. 3.
  4. 4.
  5. 5.
Suggestions (1)

Exclusions

6 selected
  1. 1.
  2. 2.
  3. 3.
  4. 4.
  5. 5.
  6. 6.
Suggestions (12)

Clarifications

3 selected
  1. 1.
  2. 2.
  3. 3.
Suggestions (4)

Download your results

Your lists as a clean, numbered PDF to attach to a proposal. Want a full proposal? Use the Bid Proposal Builder.

Your inputs stay in your browser. Results are estimates for planning, not professional, tax or legal advice.

Why write scope line by line

Every trade has a handful of items that sit on the border with another trade: who installs blocking, who provides access panels, who patches after the plumber, who hauls the spoils. Those borders are where disputes start. A proposal that names each border item as included or excluded is quick for the general contractor to level and hard to argue with later.

This library collects the lines our estimators write most often, organized by trade and CSI division. It’s a starting point, not a legal template. Always match the wording to your plans, specifications and prime contract.

How the library works

  1. Choose your trade. The tool loads a starter list of common inclusions and exclusions for that trade, along with general clarifications that apply to any trade.
  2. Pick and edit. Open Suggestions under each list to add more lines. Click any line to reword it. Use the arrow to move a line up, or ✕ to remove it.
  3. Add your own. Type a line in Write your own for anything specific to the project.
  4. Export. Download a numbered PDF with your inclusions, exclusions and clarifications, ready to attach to your proposal or paste into your template.

Your lists are saved in your browser, so you can come back and adjust them for the next bid.

How to phrase a strong exclusion

Good exclusions share three traits:

  • Specific. “Access panels, which are to be furnished by the trade requiring them” is clear. “Miscellaneous items” isn’t.
  • Tied to the documents. “Blocking not shown on the drawings” works because the drawings define what is shown.
  • Conditional where it helps. “Permits and inspection fees unless listed as included” lets you include the item on some bids without rewriting the line.

Avoid exclusions that contradict the specifications for your own trade. If spec section 09 21 16 requires you to provide something, excluding it may get your bid rejected as non-responsive. Price it, or raise it as a question before bid day.

Examples by trade

Drywall, framing and ceilings. Include framing, board, finish level and fire-rated assemblies as listed. Commonly excluded: acoustical ceilings (often bid separately), Level 5 finishes, exterior sheathing and air barriers, blocking not shown, and access panels.

Electrical. Include distribution, branch circuits and devices as drawn. Commonly excluded: utility company charges, low-voltage and fire alarm systems when bid separately, equipment furnished by others, and trenching or patching outside the building line.

Plumbing. Include domestic water, sanitary and vent systems and fixture setting. Commonly excluded: fixtures furnished by the owner, site utilities beyond five feet of the building, and cutting and patching of finished surfaces.

Concrete. Include forming, placing and finishing as detailed. Commonly excluded: testing and special inspections, winter protection, vapor barriers by others, and embedded items furnished by other trades.

General clarifications worth keeping

  • Pricing is based on the listed drawings and specifications; changes to them may change the price.
  • Pricing is valid for 30 days, with material escalation after that passed through at cost.
  • Work areas will be clear and ready, with one mobilization per phase unless noted.
  • The GC provides dumpster, laydown, temporary power, water and toilets.
  • Owner-requested changes are performed under signed change orders before work proceeds.

Next steps

To turn these lists into a complete priced proposal under your company name, use the bid proposal builder. If you’re a general contractor comparing quotes, the bid leveling matrix shows how each bidder’s exclusions change the real low number. When excluded work comes back as an extra, price it with the change order calculator.

Trade estimating guides

How estimators take off and price each trade, with the same production rates and waste factors this tool uses.

All trade guides →

Frequently asked questions

Why do exclusions matter so much in a subcontractor bid?

Exclusions define where your scope stops. When a general contractor levels bids, they plug any item you exclude, so a clear exclusion keeps your bid comparable. After award, a written exclusion is what separates extra work you get paid for from work you're expected to absorb.

Can I just write 'anything not listed is excluded'?

Keep that line as a backstop, but don't rely on it alone. A GC or owner will argue that work shown on the drawings for your trade is implied. Naming the specific items you're leaving out is far stronger than a catch-all.

What's the difference between an exclusion and a clarification?

An exclusion says a piece of work isn't in your price. A clarification states an assumption your price depends on, such as working hours, access, who provides temporary power, or how many mobilizations are included. If the assumption turns out wrong, the clarification is your basis for a change order.

Which trades are covered?

Drywall, framing and ceilings; painting and wall coverings; electrical; plumbing; HVAC and sheet metal; concrete; masonry; roofing; flooring; doors, frames and hardware; sitework and excavation; and structural and miscellaneous steel. General exclusions and clarifications apply to any trade.

Can a GC use this for scope sheets?

Yes. Many general contractors send bidders a scope sheet listing what must be included. Pick the inclusions you require, move anything you want priced separately to exclusions or alternates, and attach the PDF to your bid invitation.